Rubber Batch off Cooling Machine with BV SGS ISO

Rubber Batch off Cooling Machine with BV SGS ISO

Merchandise Profile:
  The batch off cooling machine is employed for cooling, folding and depositing the rubber strip that arrives from the open mills or twin screw extruder.

Our Equipment Edge:
  there are two framework types: overhead and ground-standing types, whose hanging racks are vertically turning with compulsive cooling. The rubber strip hanging bar adopts stage by step cylinder or motor-reducer for driving. It is composed of mainframe and electrical management system. The mainframe is composed of splicer, printing, slitter, isolation cooling, lifting gadget, hanging strip cooling, vehicle wig wag segment, weighing, handrail, platform and supporting bracket etc. The electrical control method consists of primary manage cupboards, and there’re unexpected emergency quit device in important locations.
  Consumers can choose large or lower disposition in accordance to the practical specifications. The higher disposition batch-off line has hydraulic auto wig wag segment, which can battle the rubber strip tidily, the strip tidy ratio≤100mmthere are a few functioning positions for automobile getting into and outputting of materials tray automobile rubber amassing gadget automobile cutter unit it has substantial automatization and can comprehend nobody working.
  The marking system with letter block automobile shifting purpose.
  The slitting system can cut the rubber sheet to turn into 2/three/four/6 even width strips immediately.
  The resolution liquid volume on the rubber sheet surface area can be managed by an air knife. 
   The rubber sheet from the dipping tank to the rack bar conveyor by means of a special major gadget to turn into extremely smooth and no trouble.
   With the vehicle decide-up device for foremost rubber sheet from the cooling rack bar to just take-out  CZPT instantly.
   With the special created vehicle stacking device from the folding rubber sheet to pallet extremely tidy.
   The pallet storing station can retailer eight~10 pallets with shifting-out purpose. 
   Auto lifter for transporting stacked pallets to the higher flooring routinely.
   Auto sampling, vehicle cutting, vehicle weighting , metal detector and so forth.

Composition:

There are two varieties: overhead and floor-standing sorts.

Batch off cooler can coat with isolation agent, cooling and laminated storage of the rubber sheet which extruding from mixing and plastic mixing, the composition is floor-standing type. The rubber sheets managing have overhead variety and multilayer conveying kind two sorts. This batch off cooler can be geared up with coding system, lengthcutting or crosscutting, computerized swing glue automated laminated rubber sheet weighing and chopping, automatic sampling etc. The new type chain-type batch off cooler uses South Korean technological innovation. The rubber sheet in the chain-belt is making use of multi-layer reciprocating cooling method. It is ideal for cooling slender rubber sheet and no air pollution rubber sheet.

Specification Engineering Parameter:

        Product XPG-600 XPG-800 XPG-900
Max Rubber Sheet Width 600 800 900
The Thickness Of Rubber Sheet (mm)
 
four-10 four-10 six-twelve
CZPT Velocity of Using-in Sheet eleven~22m/min ~26m/min 3~35m/min
Axial Fan .37KW  5760m3/h .37KW  5760mthree/h .37KW  5760m3/h
Swing range and frequency one.3m ten-16/min 1.3m 10-sixteen/min one.3m ten-16/min
Rubber strip temperature after cooling ≤Room temperature+5ºC ≤Room temperature+5ºC  
≤Room temperature+5ºC
Speed-altering frequency motor of lifting unit XWD5.five-one/23 XWD5.five-1/23 XWD5.5-1/23
Velocity-changing frequency motor of rubber swing gadget XWD1.1-5-1/87 XWD1.one-five-1/87 XWD1.1-five-1/87
Rubber bar pitch one hundred sixty or 101.six a hundred and sixty or one zero one.6 a hundred and sixty or one hundred and one.six
Max hanging height of rubber strip 1400mm 1400mm 1400mm

FQA-Difficulties of buyer concern:
About device overall performance top quality

1.       Q: How to guarantee the high quality of outsourcing components?
          A: First selection far more than 2 suppler by tender, There are strict system and approach for inspecting outsourcing components. And there are outsourcing inspectors, after inspection, competent products, labeling and storage. Not certified, return.
2.       Q: Which brand name of electrical portion?
          A: Use planet popular brands, Siemens, Omron, Toshiba, Schneider, ABB
CZPTer can specify the manufacturer.
3.       Q: Which PLC:
          A: Siemens, Omron, Mitsubishi
4.       Q: How to management the quality?
          A: There are inspectors for inspecting equipment good quality and efficiency, soon after assembly, equipment operate repeatedly for at the very least 12 hours at one particular time, Complete operating time must be not significantly less than 48 several hours.
About set up
one.        Q: When the guidebook engineer arrive at customer’s manufacturing facility?
           A:  If require set up on website, engineer will get there at manufacturing unit inside 1 7 days right after machine arrived at manufacturing facility.
About after-revenue services
one.        Q: What is the guarantee time?
           A: 2 many years soon after device arrived at factory
2.        Q: How to solve the issue?
            A: Within one particular hour following getting customer’ difficulty, notify the solution way, there are a few approaches for various problems. one, Which can be solved by telephone or E-mail, it will be solved in two hours. 2. Which can be solved by Distant Manage, it will be solved in four hrs(device is equipped by Remote Network Handle Dilemma). 3. Which need remedy it on site, engineer arrive at manufacturing facility inside a single week(in the two several years guarantee day, engineer has the visa any time of the country where the machine.

Device Mechanical Information:

Machine CZPT Details:

CZPT CZPTers:

 

Rubber Batch off Cooling Machine with BV SGS ISO

Tags: